Calendar icon
Saturday 11 April, 2026
Weather icon
á Dakar
Close icon
Se connecter

Northern Highway: The government is taking action against flooding at kilometer marker 24

Auteur: ivoirematin

image

Autoroute du Nord : Le gouvernement se mobilise contre les inondations au PK 24

Faced with the imminent return of rains, the Ivorian State is taking action to secure the critical point of PK 24. On Friday, April 10, 2026, a ministerial delegation composed of Dr. Amédé Koffi Kouakou (Water, Sanitation and Hygiene) and Hien Sié Yacouba (Infrastructure and Road Maintenance) went to the site to define an emergency action plan.

Immediate measures to clear the roads

The objective is clear: to avoid paralyzing the Northern Highway, as happened last year. To achieve this, the authorities have announced several priority interventions:

  1. Construction of passageways to facilitate water drainage.
  2. Removal of illegal embankments that are currently blocking natural conduits.
  3. Technical cleaning of rainwater convergence zones.
"One-off interventions are no longer sufficient. We must combine the urgency with a short and medium-term vision to definitively resolve this problem," stated Minister Amédé Kouakou.

The impact of human activity in question

The technical diagnosis is unequivocal: the natural drainage basin has been severely degraded by uncoordinated human development. Minister Hien Sié Yacouba reiterated that a highway closure, even for just one day, represents an unacceptable blow to the national economy.

An appeal to the civic responsibility of economic operators

The government does not intend to act alone. A firm appeal has been launched to local residents and industrial operators in the area:

  1. Comply with standards : All developments must be validated by state services.
  2. Harmonizing constructions : Private projects must be integrated into the overall sanitation plan.
  3. Accountability : Private investments must not compromise the viability of such a strategic infrastructure as the highway.

Alongside these emergency works, further studies are already underway to design long-term solutions that will sustainably transform stormwater management in this sector.

Auteur: ivoirematin
Publié le: Samedi 11 Avril 2026

Commentaires (0)

Participer à la Discussion

Règles de la communauté :

  • Soyez courtois. Pas de messages agressifs ou insultants.
  • Pas de messages inutiles, répétitifs ou hors-sujet.
  • Pas d'attaques personnelles. Critiquez les idées, pas les personnes.
  • Contenu diffamatoire, vulgaire, violent ou sexuel interdit.
  • Pas de publicité ni de messages entièrement en MAJUSCULES.

💡 Astuce : Utilisez des emojis depuis votre téléphone ou le module emoji ci-dessous. Cliquez sur GIF pour ajouter un GIF animé. Collez un lien X/Twitter, TikTok ou Instagram pour l'afficher automatiquement.