Côte d’Ivoire : GESTOCI renforce ses capacités de stockage avec un nouveau bac de 20 000 m³ à Yamoussoukro
The Ivorian oil sector has reached a key milestone. The Minister of Mines, Petroleum, and Energy, Mamadou Sangafowa-Coulibaly, inaugurated the R14 tank in Yamoussoukro on Friday, July 24, 2026. This new facility, belonging to the Ivorian Petroleum Stock Management Company (GESTOCI), has a capacity of 20,000 m³ of diesel fuel. The event also marked the commissioning of the country's first-ever on-site loading station.
Thanks to these new infrastructures, the nominal storage capacity of the Yamoussoukro depot has increased to 100,700 m³ . A 6,000 m³ water reservoir has also been installed to ensure site security. GESTOCI thus confirms its pioneering position in the modernization and optimization of unleaded gasoline and diesel distribution.
This shift towards source loading radically transforms operational efficiency: the loading time for a tanker truck drops from 45 minutes to just 15 minutes . The minister reassured industry professionals, specifying that this transition would be gradual.
Currently capped at 650 trucks per day between Abidjan and Yamoussoukro, the overall loading capacity aims to reach 1,800 trucks per day by 2030. To support this scaling up, Côte d'Ivoire will rely on:
Building on recent discoveries of world-class hydrocarbon deposits, Ivory Coast aims to become a net exporter of petroleum products by 2030 and intends to establish itself as the leading energy supplier in the sub-region.
To support this strategic vision, the government and GESTOCI have unveiled an impressive medium- and long-term infrastructure program:
Commentaires (0)
Participer à la Discussion
Règles de la communauté
💡 Astuce : Utilisez des emojis depuis votre téléphone ou le module emoji ci-dessous. Cliquez sur GIF pour ajouter un GIF animé. Collez un lien X/Twitter, TikTok ou Instagram pour l'afficher automatiquement.
Se connecter
Commentez avec votre profil, votre photo, et soyez averti des réponses.